Commissioning
78
9
Commissioning
9.1
Post-mounting and post-connection check
Before commissioning the device:
‣
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-mounting" check→ 30
• Checklist for "Post-connection check" → 45
9.2
Switching on the measuring device
‣
Switch on the device upon successful completion of the post-mounting and post-
connection check.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or if a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 138.
9.3
Setting the operating language
Factory setting: English or ordered local language
X X X X X X X
X
XX
1.
2.
3.
4.
36
Taking the example of the local display
X
20.50
XX
Main menu
0104-1
Display language
English
Operation
Setup
Display language
English
Ã
Deutsch
Español
Français
Display language
Ã
English
Deutsch
Español
Français
Proline t-mass F 500 HART
0104-1
0104-1
Hauptmenü
0104-1
Sprache
Deutsch
Betrieb
Setup
Endress+Hauser
A0029420