Post-connection check

After wiring the measuring instrument, perform the following checks:
• Is the terminal allocation correct (→ ä 15)?
• Is the cable gland tight?
• Is the FOUNDATION Fieldbus connector screwed tight?
• Is the housing cover screwed tight?
• If auxiliary power is available: Is the instrument ready for operation and is the liquid crystal
display visible?