Lenovo ThinkSystem Heavy Duty Full Depth 48U User Manual page 79

Rack cabinet
Table of Contents

Advertisement

Step 4.
Attach the air-purging tool to the air-purging valve at the top of the heat exchanger, and place the
drain end into a 2-liter (or larger) container to catch the water and air bubbles that escape during
the filling procedure.
Figure 85. Installing the air-purging tool
Step 5.
Connect the supply and return hose couplings with the manifolds.
.
Chapter 3
Rack cabinet setup
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d6e

Table of Contents