Electrical Installation; Identification Of The Power And Grounding Terminals - WEG CFW-11 RB User Manual

Regenerative frequency converter
Table of Contents

Advertisement

Installation and Connection

3.2 ELECTRICAL INSTALLATION

DANGER!
The following information is merely a guide for proper installation. Comply with applicable local
regulations for electrical installations.
DANGER!
Make sure the AC power supply is disconnected before starting the installation.
ATTENTION!
Integral solid state short circuit protection does not provide branch circuit protection. Branch circuit
protection must be provided in accordance with applicable local standards.

3.2.1 Identification of the Power and Grounding Terminals

U/T1, V/T2, W/T3: AC power supply.
DC-: this is the negative potential terminal in the DC Link circuit.
3
DC+: this is the positive potential terminal in the DC Link circuit.
Synchronism
terminal
3-12 | CFW-11 RB
Figure 3.14: Grounding, synchronism and power terminals of frame size E models
Grounding
(4 x M8, 4 x M5)

Advertisement

Table of Contents
loading

Table of Contents