Installation Of The Converter Hoisting Eyes - Frame Size E - WEG CFW-11 RB User Manual

Regenerative frequency converter
Table of Contents

Advertisement

Installation and Connection
1
4
3

3.1.4 Installation of the Converter Hoisting Eyes - Frame Size E

Two hoisting eyes for the converter lifting, which are mounted at the converter sides (rear part), are supplied. By
inverting their position, as shown in
useful during the mechanical installation of the converter, are obtained.
3-8 | CFW-11 RB
2
5
Figure 3.5: Repositioning the mounting supports - frame size E
Figure 3.6 on page
3-8, two points for hoisting the converter, which are very
Figure 3.6: Installation of the converter hoisting eyes frame size E
3
6

Advertisement

Table of Contents
loading

Table of Contents