Boiler Description; Boiler Delivery; Boiler Mounting - Centrometal EKO-CUP SV3 2500 Technical Instructions

Table of Contents

Advertisement

3.0.
IN GENERAL
The new boiler
EKO-CUP SV3 2500
(FOEL) and gas. The boiler has a modern construction and design regarding to the designed capacity.
It is made out of controlled high quality materials, welded with the most modern technology. The boiler
EKO-CUP SV3 2500 is approved and tested in accordance with EN standards and fulfills all special
requirements for connection to the central heating installation.
3.1.

BOILER DESCRIPTION

The boiler EKO-CUP SV3 2500 is a triple pass flue gas flow system steel hot water boiler. Flue gases
flow from the combustion chamber into the tube of second pass and then into the tube of third pass,
where turbulators are placed. Turbulators enable better transmission of the thermal energy to the boiler
water and also enable the fine flue gas outlet temperature control.
4.0.

BOILER DELIVERY

The boiler EKO-CUP SV3 2500 is delivered with outer boiler panelling made of plastificated sheet
metal and thermal mineral wool insulation together with a high quality modern designed boiler control
panel. Afterwards it is possible to build in one or two additional control units for the heating control of
one or more boiler and heating circuits.
5.0.

BOILER MOUNTING

It is recommended to mount the boiler
accordance with
the boiler heating power, normal operation condition ,
accessible
boiler, burner and boiler equipment. The boiler must be placed on the 5 to 10 cm high
concrete slab above the ground. lab edges must be protected by a
boiler must be positioned in order to enable supervision during boiler operation, cleaning and
maintenance. Due to eas
insulation has to be done after the boiler is properly placed in the boiler room as shown
Technical instructions EKO-CUP SV3 2500
for central heating is intended for firing with fuel oil extra light
EKO-CUP SV3 2500 to
S
ier
transport of the boiler into the boiler room, mounting of the thermal
In general, boiler description, delivery, mounting
in the boiler room, which has to be built
s undisturbed serving and easily
n iron made
in
frame (50x50x5). The
on
the
Figur
e 1.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eko-cup v3Eko-cup sv3

Table of Contents