Installation Of Cm Pelet-Set; Installation Of Pellet Burner And Pellet Control Unit On Boiler - Centrometal EKO-CK P 20-40 Technical Instructions

Table of Contents

Advertisement

Cm Pelet-set on boilers EKO-CK P (EKO-CK) and EKO-CKB P (EKO-CKB)
Cm Pelet-set type
Burner CPPL type
Set thermal output
Boiler type
Pellet tank volume
Pellet tank height
Pellet tank depth
Pellet tank width
Supply voltage
Boiler width
Set for installation
of pellet burner (only
new boiler models)
Lower boiler door CPDV

4. Installation of Cm Pelet-set

Commissioning and fine adjustment of Cm Pelet-set should be carried out by a professional or the
manufacturer's authorized fitter.
4.1. Installation of pellet burner and pellet control unit on the boiler
a1) On the lower boiler doors that are already planned to upgrade the pellet burner (new
boiler models)
a2) On the lower boiler door CPDV which should be further purchase.
Remove lower boiler door and install lower boiler door CPDV supplied with Cm Pelet-set (if
lower boiler door CPDV is not already installed on the boiler).
b) remove burner protection cover, place burner head (with fixed thicker gasket toward door and
thinner gasket on the side away from door) onto prepared screws on the door, then place a
Technical instructions for the commissioning and adjustment
14
CPPL-14
(kW)
14
EKO-CK
P/CKB P 20
(EKO-CK/B 20)
(l)
(mm)
(mm)
(mm)
V/Hz
(mm)
526
14-25
CPDV for
(mm)
EKO-CK P/CKB P (EKO-CK/B) 20,
25
20
25
CPPL-35
CPPL-35
20
25
EKO-CK
EKO-CK
P/CKB P 25
P/CKB P 30
(EKO-CK/B
(EKO-CK/B
25)
30)
370
1545
730
625
230/50
526
576
14-25
14-25
CPDV for
EKO-CK
P/CKB P
(EKO-CK/B)
30
30
35
CPPL-35
CPPL-35
30
35
EKO-CK
EKO-CK
P/CKB P 35
P/CKB P 40
(EKO-CK/B
(EKO-CK/B
35)
40)
626
676
30-35
30-35
CPDV for
CPDV for
EKO-CK
EKO-CK
P/CKB P
P/CKB P
(EKO-CK/B)
(EKO-CK/B)
35
40
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eko-ckb p 20-40Eko-ck 20-40Eko-ckb 20-40

Table of Contents