Removal; Disposal; Returns - GEM Q40 Operating Instructions Manual

Pneumatically operated pinch valve
Table of Contents

Advertisement

Available languages

Available languages

4. Turn the locking ring b by 90° in the direction of the arrow.
ð The word "locked" can be read on the tube holder.
5. With the valve fully assembled, check the function and
tightness.
10 Troubleshooting
Error
Possible cause
The product is leak-
Operating pressure
ing downstream
too high
(does not close or
does not close
fully)
The product leaks
Tube leaking or
downstream (does
damaged
not close or does
not close fully)
The product does
Actuator defective Replace valve
not open or does
Control pressure
not open fully
too low (for control
function NC)
Foreign matter in
the product
The actuator
design is not suit-
able for the operat-
ing conditions
The product does
The actuator
not close or does
design is not suit-
not close fully
able for the operat-
ing conditions
Foreign matter in
the product
Control pressure
too low (for control
function NO)
www.gemu-group.com
b
Troubleshooting
Operate the
product with oper-
ating pressure spe-
cified in datasheet
Check tube for po-
tential damage, re-
place tube if neces-
sary
Operate the
product at the spe-
cified control pres-
sure (see chapter
"Technical data")
Remove and clean
the product
Use an actuator
that is designed for
the operating con-
ditions
Use an actuator
that is designed for
the operating con-
ditions
Remove and clean
the product
Operate the
product at the spe-
cified control pres-
sure (see chapter
"Technical data")

11 Removal

1. Remove in reverse order to installation.
2. Deactivate the control medium.
3. Disconnect the control medium line(s).
4. Disassemble the product. Observe warning notes and
safety information.

12 Disposal

1. Pay attention to adhered residual material and gas diffu-
sion from penetrated media.
2. Dispose of all parts in accordance with the disposal regu-
lations/environmental protection laws.

13 Returns

Legal regulations for the protection of the environment and
personnel require that the completed and signed return deliv-
ery note is included with the dispatch documents. Returned
goods can be processed only when this note is completed. If
no return delivery note is included with the product, GEMÜ
cannot process credits or repair work but will dispose of the
goods at the operator's expense.
1. Clean the product.
2. Request a return delivery note from GEMÜ.
3. Complete the return delivery note.
4. Send the product with a completed return delivery note to
GEMÜ.
31 / 36
13 Returns
GEMÜ Q40

Advertisement

Chapters

Table of Contents
loading

Table of Contents