4.1 Required space for placing and maintaining

The space that C6EU needs is calculated as follows:
Vertical view: 740 mm x 615mm;
Front and backside 0.8 meter to open the front door;
Right and left 1.0 meter to facilitate maintenance personnel to replace the
connector cable.
The construction area is shown in the picture below.
18
<- min. 1.0 m ->
Figure 4.1 Construction area