In case that the station connects with backend through SIM card, the SIM card slot are
reserved on the main control board.
After installing the cable into the charging station, the bottom of the charging station is
fixed to the concrete platform by 4 fixed concrete anchor screws M10.

4.7 Verification of measurement values

Please ensure all measured values are within specified range before proceeding to
commissioning and operation.
Measurement points on
live side
L1 to N
L2 to N
L3 to N
L1 to L2
L1 to L3
L2 to L3
N to PE
(on connection terminal)
PE to N
(on connection terminal)
Table 4.7.1 Supposed measured values before commissioning
WARNING
Danger of life through wrong installation!
Extension cables are not permitted according to IEC 61851-1. If an extension cable or
a second cable set is used, there is a risk of electric shock or cable fire.
26
Unit
Voltage
Voltage
Voltage
Voltage
Voltage
Voltage
Voltage
Resistance
Copyright | C6EU SERIES Installation and Operation Manual, Version 1.6
Nominal
value
230 V
230 V
230 V
400 V
400 V
400 V
0 V
variable according to
<1000mΩ in
local law/standards and
TN-S system
different earthing system
Specified range
± 10%
± 10%
± 10%
± 10%
± 10%
± 10%