EDGE Installation Manual
3. Replace the carpet over the plywood, and allow
sufficient time for the glue to set.
WARNING: Liquid Nail™ requires 8 hours to set,
and 24 hours to completely cure. It is not
recommended to release the vehicle back into
service before the full curing time has been reached.
LIQUID NAIL™ IS HIGHLY FLAMMABLE AND
SHOULD NOT BE EXPOSED TO OPEN FLAME
OR SPARKS BEFORE THE FULL CURING TIME
HAS BEEN REACHED.
Tray Mount
1. Set the CPU Mount onto the sliding tray and
mark the position for pilot holes.
5
2. Use a
/
" metal drill bit to drill the four pilot
16
holes in the sliding metal tray.
3. Secure the CPU mount to the sliding metal tray
using four (4) ½" self tapping screws.
www.cobantech.com
Page 13 of 40
Need help?
Do you have a question about the EDGE and is the answer not in the manual?
Questions and answers