R&S ENY21 Operating Manual page 55

Eny-fts adapter set for immunity testing with
Table of Contents

Advertisement

Available languages

Available languages

R&S ENY-FTS
Set-ups for the verification of parameters are shown in the next figures. All
measurements are performed on a ground plane which exceeds the set-up at least by
20 cm on each side. A well ground connection must be established between network
and balance measuring bridge.
All free connections of the networks must be terminated with a 100 C resistor for
verification of the longitudinal conversion loss (LCL).
Operating Manual 1309.8949.14 - 02
Operation
9

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Eny41Eny81-ca6

Table of Contents