Replenishing Co2 Supply - Cornelius IDC 2XX Operator's Manual

Corneliusice maker operators manual
Table of Contents

Advertisement

Replenishing CO
2
NOTE:When indicator on the 1800-psi gage is in the shaded ("change CO
CO
cylinder is almost empty and should be changed.
2
1. Fully close (clockwise) the CO
2. Slowly loosen the CO
the regulator assembly from the empty CO
3. Unfasten safety chain and remove the empty CO
!
WARNING:
To avoid personnel injury and/or property damage, always secure the CO
prevent it from falling over. Should the valve become accidently damaged or broken off, a CO
can cause serious personnel injury or death could occur.
4. Position the full CO
5. Make sure gasket is in place inside the CO
assembly on the CO
6. Open (counterclockwise) the CO
the valve fully to back-seat the valve (back-seating the valve prevents gas leakage around the valve
shaft).
Check CO
connections for leaks. Tighten any loose connections.
2
© 2005-2010, IMI Cornelius Inc.
Supply (As Required)
cylinder valve.
2
regulator assembly coupling nut allowing CO
2
cylinder and secure with a safety chain.
2
cylinder.
2
cylinder valve slightly to allow the lines to slowly fill with gas, then open
2
- 7 -
cylinder
2
.
cylinder.
2
regulator assembly coupling nut, then install the regulator
2
IDC Operator's Manual
cylinder") portion of the dial,
2
pressure to escape, then remove
2
cylinder with a safety chain to
2
regulator
2
Publication Number: 621057403OPR

Advertisement

Table of Contents
loading

Table of Contents