Table of Contents

Advertisement

EAS24920

OIL PUMP

Removing the oil pan and oil pump
12
11
7
New
E
4
5
7
10
11
9
Order
Engine oil
Coolant
Exhaust pipe assembly
Water pump
Clutch housing
1
Oil level switch coupler
2
Oil level switch
3
Oil level switch lead holder
4
Bottom cowling bracket
5
Oil pan
6
Oil pan gasket
7
Oil strainer
8
Oil strainer gasket
9
Oil pipe
10
Ventilation chamber oil drain pipe
10
New
8
LS
9
LT
12 Nm (1.2 m
kg, 8.9 ft
Ib)
4 2
5
4
3
12 Nm (1.2 m
43 Nm (4.3 m
Job/Parts to remove
12 Nm (1.2 m
kg, 8.9 ft
New
LS
LS
New
LT
4
kg, 8.9 ft
Ib)
kg, 32 ft
Ib)
Q'ty
Drain.
Refer to "CHANGING THE ENGINE OIL" on
page 3-12.
Drain.
Refer to "CHANGING THE COOLANT" on
page 3-20.
Refer to "ENGINE REMOVAL" on page 5-1.
Refer to "WATER PUMP" on page 6-8.
Refer to "CLUTCH" on page 5-36.
1
Disconnect.
1
1
2
1
1
1
1
1
1
5-48
OIL PUMP
Ib)
New
6
13
New
LS
New
2
3
New
10 Nm (1.0 m
kg, 7.4 ft
Remarks
1
Ib)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yzfr6y 2009Yzfr6yc 2009

Table of Contents