2.1. RECEIVING THE UNIT
Each KC unit is shipped as a single crated unit.
The shipping weight is approximately 1500
pounds, and must be moved with the proper
rigging equipment for safety and to avoid
damages. The unit should be completely
inspected for shipping damage and
completeness at the time of receipt from the
carrier and before the bill of lading is signed.
Each unit has Tip-N-Tell indicator on the outside
of the crate, that indicates if the unit has been
turned on its side. If the Tip-N-Tell indicator is
tripped, do not sign for the shipment. Request a
freight claim and inspection by a claims adjuster
before proceeding or refuse delivery of the
equipment.
2.2. UNPACKING
Carefully unpack the unit by removing the
packaging material. Take care not to damage
the unit jacket when cutting away packaging
materials. An inspection of the unit should be
made to determine if damage during shipment
occurred that was not indicated by the Tip-N-
Tell. The freight carrier should be notified
immediately if any damage is detected. The
following accessories come standard with each
unit and are packed separately within the unit's'
packing container
Spare Spark Ignitor
Spare Flame Detector
Manual 1-1/4" Gas Shutoff Valve
Drain Valve Assembly
ASME Pressure Relief Valve
Ignitor Removal Tool (One per Site)
Regulator Adjustment Tool (One per
Site)
Temperature/Pressure Gauge and
Fittings
2 Lifting Lugs
Stainless Steel Condensate Cup
Optional accessories are also separately packed
within the unit's packing container. Standard and
optional accessories shipped with the unit
should be identified and put in a safe place until
installation or use.
Figure 2.1
Boiler Clearances
2
INSTALLATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aerco kc1000

Table of Contents