GF-106 THE AERCO KC1000 GAS FIRED BOILER
Operating & Maintenance Instructions
Section 1
Section 2
2.1
Receiving the Unit
2.2
Unpacking
2.3
Installation
2.4
Gas Supply Piping
2.5
Electrical Supply
2.6
Mode of Operation and Field Control
Wiring
Section 3
3.1
The Control Panel
3.2
The Temperature Controller
3.3
The Primary Menu
3.4
The Secondary Menu
3.5
The Annunciator Circuit
3.6
The Combustion Safeguard
3.7
Water Level Test and Reset
Switches
Section 4
4.1
Initial Start-Up requirements
4.2
Tools and Instrumentation for
Combustion Calibration
4.3
Combustion Calibration
4.4
Propane Combustion Calibration
Section 5
5.1
Indoor/Outdoor Reset Mode
5.2
Constant Setpoint Mode
5.3
4-20 ma Remote Setpoint Mode
5.4
4 to 20 ma Direct Drive Mode
FOREWORD
2.7
2.8
2.9
2.10
2.11
CONTROL PANEL COMPONENTS and
OPERATING PROCEDURES----------------------10
3.8
3.9
3.10
3.11
3.12
3.13
Auto Restarts
INITIAL START-UP-----------------------------------18
4.5
Boiler Reassembly
4.6
Mode of Operation Setup
4.7
BOILER MODE of OPERATION-------------------24
5.5
5.6
5.7
i
CONTENTS