7.2
Electrical wiring
Fuse
I
6AT
L
N
Key (Fig. 14)
st
EV1
-
1
stage valve
nd
EV2
-
2
stage valve
I
-
Ground fault switch
M
-
Fan motor
PC
-
Flame sensor
PR
-
Pre-heater
S
-
Selector
SE
-
External lock-out signal
XPA
-
Control box terminal board
XPM
-
Fan motor connector
XPR
-
Pre-heater connector
st
XPV1
-
1
stage valve connector
nd
XPV2
-
2
stage valve connector
20163551
Electrical system
XPA
PE
3
Thermostat
11
L
3
7
10
N
3
Aux
SE
1
2
8
11
10
6
Yellow/Green
Blue
Brown
Black
3
White
Black
10
Black
3
Black
Aux
Brown
1
Blue
2
Black
8
Brown
Black
Grey
TESTING
Check the shut-down of the burner by opening the thermostats.
Do not swap neutral and phase over, follow
The electrical wiring carried out by the
WARNING
The section of the conductors must be at
16
GB
PE
XPV2
1
2
XPM
1
1
2
3
3
XPR
1
1
2
2
XPV1
1
1
2
2
3
3
the diagram shown carefully and carry out a
good earth connection.
installer must be in compliance with the rules
in force in the country.
2
least 1mm
. (Unless requested otherwise by
local standards and legislation).
20163574
EV 2
M
PR
PC
EV 1
1
4
I
NC
NO
2
3
S
Fig. 14