3onedata ICS5000-E24GP4GS Quick Installation Manual

3onedata ICS5000-E24GP4GS Quick Installation Manual

Layer 2 managed industrial ethernet poe switch

Advertisement

Quick Links

ICS5000-E24GP4GS
Layer 2 Managed Industrial
Ethernet PoE Switch
Quick Installation Guide
3onedata Co., Ltd.
Address: 3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Xili, Nanshan District, Shenzhen
Website: www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485

【Package Checklist】

Please check the integrity of package and accessories while
first using the switch.
1. Industrial Ethernet switch
2. Install components
3. Power line
4. Warranty card
Certificate
5.
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.

【Product Overview】

This product is a 28-port Gigabit layer 3 TSN industrial
Ethernet switch, and its model is: ICS5000-E24GP4GS (24
Gigabit PoE ports + 4 Gigabit SFP slots, 100~240VAC
power input).

【Panel Design】

Front view
Rear View
1.
LED indicator
2.
Restore default settings RESET
3.
10/100/1000Base-T(X) Gigabit PoE copper port
4.
1000Base-X Gigabit SFP slot
5.
CONSOLE port
6.
Grounding screw
7.
Terminal blocks for 100~240VAC AC power supply
input

【Mounting Dimension】

Unit: mm
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding
between
condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging
the device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.

【Desktop Mounting】

When the switch is installed on a stable desktop. Please
install the attached rubber foot pads on the four corners of
the bottom of the switch, and then place them at the
designated positions on the desktop, leaving enough
ventilation space for the switch to dissipate heat.

【Rack Mounting】

This product adopts rack-mounting, mounting steps as
below:
Step 1
Select the device mounting location to ensure
enough size.
Step 2
Adopt 4 bolts to install the mounting lugs in the
device position as figure below.
Step 3
Place the device in the rack; adopt 4 bolts to fix
two sides mounting lugs in the rack.
10%~90%
without

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ICS5000-E24GP4GS and is the answer not in the manual?

Questions and answers

Summary of Contents for 3onedata ICS5000-E24GP4GS

  • Page 1 ASAP. 【Product Overview】 Notice Before Mounting: This product is a 28-port Gigabit layer 3 TSN industrial Don't place or install the device in area near water or Ethernet switch, and its model is: ICS5000-E24GP4GS (24 ...
  • Page 2 Definition green transmission PD is not connected to 【Checking LED Indicator】 the corresponding port Indicator off or PoE power is not provided PD is connected to the status The yellow corresponding port and indicator light keeps on PoE is powered normally (1-24) As shown above, the device provides LED indicators to...
  • Page 3 “admin123”. Please refer to user manual for specific configuration  method of logging in to WEB interface and other configurations about network management function. 【Specification】 Panel Gigabit PoE copper 10/100/1000Base-T(X) port self-adaption or forced mode, RJ45, Automatic Flow Control, Full/Half Duplex Mode, MDI/MDI-X Autotunning, power...

Table of Contents