Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
1
Installing the Upper Handle
Parts needed for this procedure:
4
Handle bolt
4
Curved washer
4
Locknut
Procedure
Note: Do not remove the rubber band on the cables until
you have installed the upper handle.
1. Lift and rotate the upper handle and position it over
the lower handle
(Figure
Important: Route the cables attached to the
®
Quick Stick
inside the upper handle legs and
ensure that the cables and the wire for the
headlight are not pinched between the handle
sections.
Description
Handle bolt
Curved washer
Locknut
No parts required
No parts required
Carriage bolt
Locknut
No parts required
No parts required
No parts required
No parts required
No parts required
4).
Qty.
4
4
Install the upper handle.
4
–
Install the wheel-clutch-cable ends.
–
Install the traction-control linkage.
2
Install the chute-control rod.
2
Connect the headlight and handwarmer
–
wire to the engine.
–
Check the engine-oil level.
–
Check the tire pressure.
–
Check the skids and scraper.
–
Check the operation of the traction drive.
1. Cables
2. Secure the upper handle with 4 handle bolts, 4 curved
washers, and 4 locknuts from the loose-parts bag
(Figure
5).
5
Use
Figure 4