3.3 Commissioning

3.3.1 VIPA Startup-Manager

Start screen
Selection menu
HB160 | PPC | 67S-PNJ0 | GB | 15-30
CAUTION!
– Before commissioning the device must be brought to
room temperature.
– At condensation the device must be absolutely dry
before connected to power.
– To avoid overheat during operation the device must not
be laid open to direct sun light.
– After opening the control cabinet or desk, there are
parts with possible dangerous voltage available.
– For all signal connections only screened cables are
permitted.
– Signal cables must not be let within the same cable
shaft as high voltage cables.
As soon as the Panel PC is provided by power supply, the VIPA
Startup-Manager will be loaded.
At the first startup of the VIPA Startup-Manager the following start
screen appears.
There is a button on the initial screen with a counter, which counts
backwards. If you click on this button within this time, the project will
start. If the time expires, the project will start automatically. With the
button 'Main' you get to the 'selection menu' .
A delay time of 5 seconds is default. In the selection menu under
"Autostart" you can adjust this time.
There are following buttons in the selection menu:
n
Settings
n
Info/Update
n
Autostart
Deployment Panel PC
Commissioning > VIPA Startup-Manager