3.2 Commissioning

3.2.1 Startup-Manager

Start screen
Selection menu
24
CAUTION!
Before commissioning the device must be brought to room tempera-
ture.
At condensation the device must be absolutely dry before connected
to power.
To avoid overheat during operation the device must not be laid open
to direct sun light.
After opening the control cabinet or desk, there are parts with pos-
sible dangerous voltage available.
For all signal connections only screened cables are permitted.
Signal cables must not be let within the same cable shaft as high
voltage cables.
As soon as the Touch Panel is provided by power supply, the Startup-Manager will be
loaded. At the first startup of the Startup-Manager the following start screen appears.
n
There is a button on the initial screen with a counter, which counts backwards. If you
click on this button within this time, the project will start. If the time expires, the project
will start automatically. With the button 'Main' you get to the selection menu.
n
A delay time of 5 seconds is default. In the selection menu under "Autostart" you can
adjust this time.
There are following buttons in the selection menu:
n
Settings
n
Info/Update
n
Autostart
n
Backup
n
Exit
n
Back