5.11.2 Gas Train; 5.11.3 Gas Train Installation - Riello RS 310/EV MZ Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

5.11.2 Gas train

Approved according to standard EN 676 and provided separately
from the burner.

5.11.3 Gas train installation

Disconnect the electrical power using the main
switch.
DANGER
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Installation
20072044
27
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
GB
Fig. 26
20081760

Advertisement

Table of Contents
loading

Table of Contents