Steps For Finalizing The Installation - FireplaceXtrordinair 864 TRV 31K Installation Manual

With ember-glo lights
Hide thumbs Also See for 864 TRV 31K:
Table of Contents

Advertisement

Finalizing the Installation

Steps for Finalizing the Installation

1.
Remove the barrier and glass (see page 47).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the
household (AC) power goes out and are required for operation.
(see illustration below). Synchronize the transmitter to the IFC.
4.
Install the firebacks (if applicable -see page 50).
NOTE: If no firebacks are used, make sure the media tray covers are in place (see below)
5.
Install the ember chunks and ember bed glass (see page 51Error! Bookmark not defined.)
6.
Install the logs (see page 50).
7.
Replace the glass.
8.
Start the heater.
9.
Leak test all gas joints.
© Travis Industries
(for qualified installers only)
Install three AAA batteries into the remote
8/17/2018 - 1482
45
864 31K

Advertisement

Table of Contents
loading

Table of Contents