Once the meter model is selected, additional requested
fields will appear:
-
METER PHASE: If the METER is three-phase, the
phase to which the inverter is connected must be
selected. (This field will appear only if you select
the ABB B23 3PH meter model)
-
ENERGY POLICY: set the way in which you want
to manage the energy produced by the PV plant,
choosing from the following:
Management
Description
mode
The system automatically mana-
ges power flows in order to maxi-
Self
mise self-consumption. All unused
consumption
power from domestic loads will
feed into the grid.
The system automatically mana-
ges power flows in order to avoid
the injection of energy to the grid.
If the meter is disconnected or not
Zero injection
working the inverter's output po-
wer is restricted to zero in order to
avoid accidental power feeding to
the grid.
The system automatically mana-
ges power flows in order to avoid
feeding the grid with power greater
than:
Configurable
where P
tovoltaic generator ("PV GENE-
RATOR POWER" parameter) and
P
lim
respect to P
WER" parameter).
-
PV GENERATOR POWER: Insert the power value
of the photovoltaic system (kWp) installed.
-
FEED-IN POWER: Set the percentage AC po-
wer restriction (with reference to the value of the
photovoltaic system (kWp) installed) to be feed into
the grid. This field can be edited only if the Energy
Policy selected is "Configurable".
Confirm the settings by clicking "END" and the inverter will
test the meter working (if selected a meter device) and it
will reboot at the finish of test phase.
- 102 -
7 - Operation
P
x P
DC
lim
is the power of the pho-
DC
is the output power limit with
(%) ("FEED-IN PO-
DC