2
Figure 2-2. Assembling the Outer Rails

Outer Rack Rails

Outer rails attach to the rack and hold the chassis in place. The outer rails for the
SC826 chassis extend between 30 inches and 33 inches.
Installing the Outer Rails to the Rack
1. Secure the back end of the outer rail to the rack, using the screws provided.
2. Press the button where the two outer rails are joined to retract the smaller
outer rail.
3. Hang the hooks of the rails onto the rack holes and if desired, use screws to
secure the front of the outer rail onto the rack.
4. Repeat steps 1-3 for the remaining outer rail.
1
3
screw the handles the
outer rails for secure
purpose if necessary
2-6
F.
SCREW
SCREW
1
2
COMPLETE
Installing the Chassis into a Rack
1. Extend the outer rails as illustrated above.
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both
sides. When the chassis has been pushed completely into the rack, it should
click into the locked position.
SCREW
screw the handles the
4. Optional screws may be used to secure the to hold the front of the chassis to
outer rails for secure
the rack.
purpose if necessary
Note: The figure above is for illustration purposes only. Always install servers to
the bottom of the rack first.
Chapter 2: Server Installation
ABLECOM
DATE:2008/08/14
REV:2
Figure 2-3. Installing the Rack Rails
COMPLETE
2-7
ABLECOM
DATE:2008/08/14
REV:2

Advertisement

Table of Contents
loading

Table of Contents