Ignition Assembly And Its Cover; Assembly Of The Electric Starter - SHERCO 125 SE FACTORY Workshop Manual

Hide thumbs Also See for 125 SE FACTORY:
Table of Contents

Advertisement

ENGINE REASSEMBLY
❱❘ Ignition assembly and its cover
• Place the half-moon wedge in its housing on the connecting rod assembly.
• Insert the rotor on the connecting rod assembly.
• Apply blue brake fluid on the threading.
• Insert tool 1815, install the nut and tighten to 80 N-m.
• Set up the 2 centering bushings.
• Introduce a new joint and fasten the ignition cover.
❱❘ Assembly of the electric starter
• Replace the O-ring on the starter by a new joint.
• Apply a bit of lubricant on the O-ring.
• Insert the starter into the right-hand casing.
• Fasten the starter with the 2 hex sprocket screws.
• Finish the step by oiling and then inserting the clutch control rod into the main shaft
• Assemble the speed selector with its screw and washer.
• Assemble the two drainage plugs with a new joint
The transmission gearbox needs to be filled when the engine is returned to its frame;
33
otherwise, a portion of the oil will leak from the main shaft
125 SE-R
CAUTION
.
[1].

Advertisement

Table of Contents
loading

This manual is also suitable for:

125 se-r

Table of Contents