Connecting Rod Assembly; Coat Lubricant On The Fork Guiding Tip And Insert The Rings [1] From The Top; Fasten The Supporting Washer[2] Onto The Secondary Shaft; Present The Primary And Secondary Shafts Together, Then Drive Them Into Their Respective Bearings Until Reaching The Stop - SHERCO 125 SE FACTORY Workshop Manual

Hide thumbs Also See for 125 SE FACTORY:
Table of Contents

Advertisement

ENGINE REASSEMBLY
For the blow-up drawings, please refer to the 125SE-R spare parts catalogue
❱❘ Connecting Rod Assembly
Insert the connecting rod assembly into the
ball bearing by the top, in exercising
precaution, until reaching the sto
CAUTION
The crank must be positioned on the
cylinder side.
❱❘ Transmission Gearbox
• Coat lubricant on the fork guiding tip and
insert the rings [1] from the top
• Fasten the supporting washer[2] onto the
secondary shaft
• Present the primary and secondary shafts
together, then drive them into their
respective bearings until reaching the stop.
CAUTION
Any fork used must be paired with its
original pinion as well as its roller.
• Hook the forks into the grooves of the
moving pinions and insert the drum into its
bearing
CAUTION
When hooking the forks into the drum pay
special attention to prevent the rollers from
falling off of the tips
• Lubricate the fork axes and insert them into the
forks. Drive the forks into their housing in the
casing until reaching the stop
CAUTION
The gearbox shafts must now turn without
hitting any hard points
p
1
2
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

125 se-r

Table of Contents