IBC SL 20-160 G3 Installation And Operating Instructions Manual page 31

Modulating gas boiler
Table of Contents

Advertisement

WARNING
Close fill valve after any addition
of water to the system, to reduce
risk of water escapement.
NOTE
Full sized application drawings
can be downloaded from our web
site.
www.ibcboiler.com
NOTE
The boiler, when used in
connection with a refrigeration
system, must be installed so
the chilled medium is piped
in parallel with the boiler with
appropriate valves to prevent the
chilled medium from entering the
boiler.
NOTE
The boiler piping system of a hot
water boiler connected to heating
coils located in air handling units
where they may be exposed to
refrigerated air circulation must
be equipped with flow control
valves or other automatic means
to prevent gravity circulation
of the boiler water during the
cooling cycle.
INSTALLATION
SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, SL 30-199 G3 MODULATING GAS BOILERS
System piping is connected to the boiler using the 1" NPT Male threaded fittings on the
right or left side connection ports. Unions and gate or ball valves at the boilers supply and
return water connections are recommended to simplify servicing. Un-insulated hot water
pipes must be installed with a minimum 1" clearance from combustible materials.
Figure 30: Boiler trim basic options
Fluid fill is most often accomplished by using a boiler regulator & fill valve set at 12 psig
or more, with the appropriate backflow prevention device as required by local code. This
is acceptable in areas where municipal water or well water has been treated and filtered
to remove excessive minerals and sediment, and water chemistry is known to be suitable
for closed loop hydronic systems. In areas where water quality is in question, or when
chemical treatment or glycol is required, other options should be considered. Follow
applicable codes and good piping practice.
There are a number of boiler feed and pressurization devices on the market today that
may be a better choice than a raw water fill from the mains. When regular maintenance
requires relief valve blow-off, the discharge may be directed back into the pressurization
unit for recycling of boiler fluid and chemicals back into the system. In buildings that may
be unoccupied for long periods of time, pressurization units are useful to prevent flood
damage should leakage occur from any component in the system. An additional benefit is
that backflow prevention devices are not required when using these devices.
Do not place any water connections above the boiler. Leaks can damage the fan and
controls. If needed, create a shield over the top of the cover, but allow clearance for airflow
and service access.
For best results regarding the SL 14-115 G3, use a Primary/Secondary piping system with
a pumped boiler loop (using 1" piping). Heat exchanger head is only 1.5' at 4 USgpm and
approximately 4' at 10 USgpm.
The minimum flow rate required through the heat exchanger is listed in Tables 5A and 5B.
Primary/Secondary piping ensures adequate flow and de-couples Δ°T issues (boiler vs.
distribution). Aim for a 20° to 30° F Δ°T across the heat exchanger at high fire (there is a
boiler protection throttle fence limiting the Δ°T to 40°F).
Propylene glycol solution is commonly used in a closed loop where freeze protection is
required. Its density is lower than that of water, resulting in lower thermal performance at a
given flow and pressure. As a rule of thumb, a 50%:50% solution of propylene glycol and
water will require an increased system circulation rate (gpm up 10%), and system head
(up 20%) to provide performance equivalent to straight water.
1-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 14-115 g3Sl 10-85 g3Sl 30-199 g3

Table of Contents