Electrical Connections; Power Supply; Control Boxes; Installation Of Control Unit Brackets - Hardi RANGER 2000 Instruction Book

Table of Contents

Advertisement

4 - Sprayer setup

Electrical connections

Power supply

Power requirement is 12V DC. Note polarity! The wires must be at least
10 awg. (4.0 mm²) to ensure a sufficient power supply. For the operating
unit, the tractor circuit should have an 8 Amp fuse. The supplied power
connector is standard on most newer tractors. If using a tractor with a
different power connector, it is necessary to disassemble connector and
attach the wires to the actual tractor connector.

Control boxes

Control boxes are fitted in the tractor cabin at a convenient place.
Spray control unit requires:
Wire 12 awg, fuse 10 Amp
Hydraulic control unit requires:
Wire 10 awg, Fuse 15 Amp

Installation of control unit brackets

The supplied tractor pillar bracket (A) has a hole spacing of 3.9 in.
(100mm) and 4.7 in. (120mm). Check tractor instructions manual for
information regarding attachment points.
Three tubes (B) are supplied. One, two or all 3 may be used. They can be
bent and shortened. A spacer (C) is also supplied to allow further
attachment possibilities. Find the best solution for your tractor or
vehicle.
Tube (B) plate is staggered, so if correctly orientated, all boxes will line
up.

Installation of control box - EVC control unit

Find a suitable place in the tractor's cabin. Best recommended
placement is to the right of the driver seat and in combination with the
Hydraulics control unit. It should be secured from movement.
ATTENTION! Tractor driver's seat is the intended working place
during operation.
4.6

Advertisement

Table of Contents
loading

Table of Contents