Page 1
ITEM: L-AZ 904** 2 TONE LAVATORY FAUCET INSTALLATION & OPERATION MANUAL V1.0 10/30/2022 LEAD FREE NSF/ANSI/CAN 61 DON’T WAIT! REGISTER NOW! Register your product within 90 days to ensure your product is recognized as an purchase and is for warranty coverage.
Page 5
INSTALLATION STEP 1: Remove Rubber Gasket [12], Metal Gasket [13] and Mounting Kit [14] from Faucet. Faucet Install Faucet with O-ring [11] at the bottom into the faucet hole on sink. Adjust the Faucet. Slide Rubber Gasket [12], Metal Gasket [13] up onto Faucet under sink and secure with Mounting Kit [14].
Page 6
INSTALLATION Handle Faucet [09] [10] STEP 3: Turn on hot and cold water supplies and check all connections for leaks where indicated by arrows. Retighten if necessary, but Do Not Overtighten. Using the Key [10], remove Aerator [09] from Faucet. Turn the Handle to full on position and flush water lines for one minute.
Page 7
INSTALLATION Washer Body Plastic washer Gasket Lock nut Outlet pipe STEP 5: STEP 6: Slide Washer, Plastic washer and Lock nut Install the Outlet pipe with Gasket up onto the up onto the Body from under the sink and secure Body from under the sink and tighten it securely.
Need help?
Do you have a question about the L-AZ 904 Series and is the answer not in the manual?
Questions and answers