Download Print this page

TANDBERG MPS 200 Administrator's Manual page 20

Hide thumbs Also See for MPS 200:

Advertisement

MPS 200/800
Contents
Introduction
Precautions, Unpacking and Mounting
Precautions
!"
Never install communication equipment during a lightning
storm.
!"
Never install jacks for communication cables in wet locations
unless the jack is specifically designed for wet locations.
!"
Never touch un-installed communication wires or terminals
unless the communication line has been disconnected at the
network interface.
!"
Use caution when installing or modifying communication lines.
!"
Avoid using communication equipment (other than a cordless
type) during an electrical storm. There may be a remote risk of
electrical shock from lightning.
!"
Do not use communication equipment to report a gas leak in
the vicinity of the leak.
!"
The socket outlet shall be installed near the equipment and
shall be easily accessible.
!"
Never install cables without first switching the power OFF.
!"
This product complies with directives: LVD 73/23/EC and EMC
89/366/EEC.
!"
Caution - Double pole fusing.
!"
Power must be switched off before power supplies can be
removed from or installed into the unit.
D14033.10—APRIL 2009
Getting started
Getting started
Using the MPS
Unpacking
To avoid damage to the unit during transportation, the TANDBERG
MPS is delivered in a special shipping box.
The shipping box contains the following components:
Chassis:
1. 
a. 
MPS 200, a 3U chassis with power supply.
b. 
or MPS 800, a 9U chassis with 2 or 3 x Power Units
(depending on the number of Media Processing Boards
installed)
c. 
1 x System Controller Board
d. 
The Media Processing Boards ordered
e. 
PRI E1/T1 ISDN Interface Card (if ordered)
V.35 Serial Interface Card (if ordered)
f. 
Administrator Guide and other documentation on CD
2. 
3. 
Installation sheets
4. 
4 screws and 4 nuts for rack mounting and 4 pads
5. 
Cables:
Power cable
a. 
b. 
Ethernet cables
c. 
ISDN cables (optional)
d. 
V.35 kit (optional). The kit includes cables that convert
from high-density connectors on V.35 card to TANDBERG's
standard V.35 connectors (26pin DSUB) and 19" rack-
mountable panel where the V.35 connectors will fit.
RJ45 to RS-232 converter cable
e. 
System status
System configuration Gateway configuration
Administrator Guide
MCU configuration
Appendices
Preparations on Site
The mounting space must be prepared before you start:
!"
Make sure the TANDBERG MPS is accessible and that all
cables can be easily connected
!"
For ventilation: Leave a space of at least 10cm (4 inches)
behind the TANDBERG MPS's rear panel and 10cm (4 inches)
in front of the front panel
!"
The room in which you install the TANDBERG MPS should have
an ambient temperature between 0ºC and 35ºC (32ºF and
95ºF) and between 10% and 90% non-condensing relative
humidity
!"
Do not place heavy objects directly on top of the TANDBERG
MPS
!"
Do not place hot objects directly on top, or directly beneath the
TANDBERG MPS
!"
Use a grounded AC power outlet for the TANDBERG MPS.
Mounting the MPS on a Rack
The TANDBERG MPS comes with 4 screws and 4 nuts for mount-
ing in standard 19" racks. The chassis is equipped with brackets.
1. 
Before starting the rack mounting, please make sure the TAND-
BERG MPS is placed securely on a hard, flat surface.
2. 
Disconnect the AC power cable.
3. 
Make sure that the mounting space is according to the
rations on Site
in the section above.
4. 
Insert the chassis into a 19" rack, and secure with screws in
the front (four screws) and nuts (four nuts).
Contact us
Prepa-
19

Advertisement

loading

This manual is also suitable for:

Mps 800