Connecting The Device To The Solenoid Valve And The Electrical Control Box - JUKI AMS-221F Instruction Manual

Pneumatic type cassette chuck device
Hide thumbs Also See for AMS-221F:
Table of Contents

Advertisement

3-2. Connecting the device to the solenoid valve and the electrical control box

DANGER :
1. To avoid electrical shock hazards, turn OFF the power and open the control box cover after about
five minutes have passed.
2. Be sure to turn OFF the power switch first. Then, open the control box cover and carry out the
work.
* Underside of the table, as viewed from the front
connector(10P) : HK063610100 1 piece
solenoid valve cables asm.: 40190157 2 pieces
Projection of the
ピンコンタクト突起
pin contact
A
Claw of the connector
コネクタ爪
Side face of the
(コネクタ側面)
connector
1) Loosen setscrew ❷ in end block ❶ , and draw
out end block ❶ in the direction A.
2) Insert solenoid valve ❸ into the position as
shown in the figure.
3) Insert end block ❶ into rail ❹ , and tighten set-
screw ❷ while contacting the end block closely
to the solenoid valve.
When tightening setscrew ❷ , care should
be taken so that there will be no clearance
among the solenoid valve and other compo-
nents since air leakage will be caused if so-
lenoid valve and other components are not
closely set. Be sure to insert three bushings
❺ into solenoid valve ❸ .
4) Connect two solenoid valve cables (40190157)
that are packed together with the device to the
connectors (HK063610100).
5) Connect the solenoid valve cable
asm. to the connectors.
Insert the red cable to the 7P and
9P of the connector.
Insert the black cable into the 8P
and 10P of the connector.
Insert the cables into the connec-
tors in such a way that the pin
contact projections are caught on
the connector claws.
– 6 –

Advertisement

Table of Contents
loading

Table of Contents