Assembly - Graco Dispensit 710 Instructions Manual

Dispense valve
Table of Contents

Advertisement

Assembly

Refer to the illustration on page 14 and the drawings at
the back of this manual for your exact model.
NOTE: Clean all valve parts with an appropriate solvent
prior to assembly. Always install new, lightly lubricated
o-rings and seals when assembling the valve. Use Kry-
tox 203GPL (part number 84/0200-K3/11) for lubricating
valve parts including seals and o-rings. Lubricate the
bore of the Valve Body (3) and the Valve Sleeve (3)
before assembly. Check the Piston (4), Valve Sleeve (3)
and Needle Seat (1) for wear and if they are worn
secure replacements before proceeding.
NOTE: Use caution as you install new U-cup and Posi-
pak seals so that they are not pinched or torn. Do this by
making sure they are lubricated, and by tucking the lips
of the seal inward before uniformly pushing them into
position. Always consult the illustrations and drawings to
be sure that seals face the correct direction.
1. Install the Posipak Seals (7) in the Valve Sleeve (3).
2. Insert the Spacer (8).
3. Install the U-cup Seals (10) in the Valve Sleeve (3).
4. Align the Spacer (8) and insert the Retaining Tube
(9) into the Valve Sleeve (3).
5. Install the Washer (11) and the Retaining Ring (12)
in the Valve Sleeve (3).
6. Install the O-rings (6) on the Valve Sleeve (3) and
on the End Cap (14).
7. Install the End Cap (14) in the Valve Body (5).
Secure the End Cap (14) with the Set Screw (27).
Caution: Do not install the Adjustment Screw (21)
at this time.
8. Install the U-cup Seals (16) on the Piston Assembly
(4) positioning them as noted in the illustration.
9. Lubricate the piston rod and insert the Piston
Assembly (4) into the Valve Sleeve (3).
10. Place the Spring (13) on top of the Piston Assembly
(4) and using the boss on the top of the piston to
center the spring insert the Piston Assembly (4) and
Valve Sleeve (3) into the Valve Body (5) until the
spring compresses. Hold this in place firmly.
11. Align and insert the Retaining Plug (17). Tighten the
Retaining Plug (17) until it is snug. Do not over-
tighten.
332094C
12. Carefully install the Needle Block (23) through the
Gasket (24) and into the Needle Seat (1).
13. Position the O-ring (18) on the Needle Seat (1) and
place against the Valve Sleeve (3). Install the Nut
(2) and tighten until snug. Do not overtighten.
14. Lubricate the threads of the Adjustment Screw (21)
and thread the Hex Nut (20) onto it fully. Insert the
O-ring (19) into the End Cap (14). Thread the
Adjustment Screw (21) and Hex Nut (20) into the
End Cap (14) through the O-ring (19) until the
Adjustment Screw stops. Back the Adjustment
Screw (21) off two turns, then tighten the Hex Nut
(20) down against the O-ring (19) and End Cap (14).
15. Install the open port and close port Elbows (25) and
their Gaskets (24). Install the Tubing (29).
16. Mount the valve to its point of use.
17. Connect the material inlet line to the Adapter (15).
18. Attach the air supply line connectors (28) to the con-
troller.
Perform the Dry System Checkout, Material Loading
and Wet System Checkout procedures. The 710S
Dispense Valve is now ready to be placed back in
service.
Periodic Maintenance
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

A9a01019

Table of Contents