Huawei SUN600-5KTL-L0 User Manual page 80

Hide thumbs Also See for SUN600-5KTL-L0:
Table of Contents

Advertisement

SUN600-(5KTL, 6KTL)-L0
User Manual
Figure 7-12 Wiring diagram for the DRM function
Table 7-4 DRM requirements
Mode
DRM0
Procedure
Step 1 On the home page, choose Settings > Feature parameters.
Step 2 Set DRM to
Issue 04 (2023-02-17)
NO TE
The demand response enabling device (DRED) is a power grid dispatch device.
Port on the inverter
DI1 and GND of the COM
port
.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
Requirements
● When switches S0 and S9 are
switched on, the solar inverter
should be turned off.
● When switch S0 is switched
off, and switch S9 is switched
on, the solar inverter should
be grid-tied.
74

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun600-6ktl-l0

Table of Contents