Pipes; Laying Suction And Pressure Lines Dgb - Danfoss BOCK HRX CO2 T H Translation Of The Original Instructions

Table of Contents

Advertisement

4 | Compressor assembly

4.5 Pipes

Pipes and system components must be clean and dry inside and free of scale, swarf and layers
of rust and phosphate. Only use hermetically sealed parts to connect to the compressor and the
refrigeration system.
Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being
cracked and broken by severe vibrations.
Ensure a proper oil return.
Keep pressure losses to an absolute minimum.
4.6 Laying suction and pressure lines
ATTENTION Property damage possible.
INFO
D
GB
A rule of thumb: Always lay the first pipe section starting from the shut-off valve downwards and
parallel to the drive shaft.
F
E
As short as
possible
14 | AQ452531257528en-000201
Improperly installed pipes can cause cracks and tears which can
result in a loss of refrigerant.
Proper layout of the suction and pressure lines directly after
the compressor is integral to the smooth running and vibration
behaviour of the system.
Rigid fixed
point
© Danfoss | Climate Solutions | 2023.06
Fig. 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hrx40-2 co2 t hHrx60-2 co2 t h

Table of Contents