10 Periodic Checks And Commissioning Of Pressure Equipment - Daikin EWAH TZ D Series Installation, Operation And Maintenance Manual

Air cooled chiller with inverter driven screw compressor
Table of Contents

Advertisement

10 PERIODIC CHECKS AND COMMISSIONING OF PRESSURE EQUIPMENT

The units are included in category II → III of the classification established by the European Directive 2014/68/EU (PED).
For chillers belonging to this category, some local regulations require a periodic inspection by an authorized agency.
Please check with your local requirements.
After a period of 10 years the manufacturer advises to carry out a total control of the whole and above all the integrity
check of the pressurized refrigeration circuits, as required by the laws in force in some European Community countries.
D–EIMAC01905-23_00EN - 50/53

Advertisement

Table of Contents
loading

Table of Contents