Guidelines When Connecting The Refrigerant Piping - Daikin ERLA03DAV3 Installer's Reference Manual

Hide thumbs Also See for ERLA03DAV3:
Table of Contents

Advertisement

7
|
Piping installation

7.3.3 Guidelines when connecting the refrigerant piping

Installer reference guide
60
NOTICE
Take the following precautions on refrigerant piping into account:
Avoid anything but the designated refrigerant to get mixed into the refrigerant
cycle (e.g. air).
Only use R32 when adding refrigerant.
Only use installation tools (e.g. manifold gauge set) that are exclusively used for
R32 installations to withstand the pressure and to prevent foreign materials (e.g.
mineral oils and moisture) from mixing into the system.
Install the piping so that the flare is NOT subjected to mechanical stress.
Protect the piping as described in the following table to prevent dirt, liquid or
dust from entering the piping.
Use caution when passing copper tubes through walls (see figure below).
Unit
Outdoor unit
Indoor unit
INFORMATION
Do NOT open the refrigerant stop valve before checking the refrigerant piping. When
you need to charge additional refrigerant it is recommended to open the refrigerant
stop valve after charging.
Take the following guidelines into account when connecting pipes:
Coat the flare inner surface with ether oil or ester oil when connecting a flare
nut. Tighten 3 or 4 turns by hand, before tightening firmly.
ALWAYS use 2 wrenches together when loosening a flare nut.
ALWAYS use a spanner and torque wrench together to tighten the flare nut when
connecting the piping. This to prevent nut cracking and leaks.
a
b
c
d
a
Torque wrench
b
Spanner
c
Piping union
d
Flare nut
Installation period
>1 month
<1 month
Regardless of the period
Protection method
Pinch the pipe
Pinch or tape the pipe
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1A – 2020.05

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma 3 r fEhfz03s18dj3vEhfz-d3vErla-dv

Table of Contents