Installing The Lower Triple Clamp (All Special Models) - KTM 250 EXC SIX DAYS TPI 2022 Owner's Manual

Hide thumbs Also See for 250 EXC SIX DAYS TPI 2022:
Table of Contents

Advertisement

12 SERVICE WORK ON THE CHASSIS
12.12
72
Installing the lower triple clamp
B01218-10
E00927-10
S03515-11
S04824-14
(All special models)
Main work
Clean the bearing and sealing elements, check for damage,
and grease.
High viscosity grease (
Insert the lower triple clamp with the steering stem. Mount
upper steering head bearing.
Check whether upper steering head seal
tioned.
2
Mount protective ring
Position the upper triple clamp with the handlebar.
4
Mount screw
, but do not tighten yet.
Position the clutch line and the wiring harness.
Position the combination instrument holder, and mount and
5
tighten screws
.
Guideline
Remaining screws,
chassis
Position the fork legs.
6
Bleeder screws
are positioned toward the front.
Info
The rebound damping is located in right fork leg REB
(red adjuster). The compression damping is located in
left fork leg COMP (white adjuster).
Grooves are milled into the side of the upper end of the
fork legs. The second milled groove (from the top) must
be flush with the upper edge of the upper triple clamp.
p. 170)
1
is correctly posi-
3
and O-ring
.
M6
10 Nm (7.4 lbf ft)

Advertisement

Table of Contents
loading

Table of Contents