Download Print this page

Exmark Lazer Z LZE Operator's Manual page 61

Advertisement

1. Cylinder rod end
2. Cotter pin
11.
Remove and retain the bolts that secure the upper
pivot pins to the deck and then remove the pivot
pins.
1. Upper pivot pins
2. Bolt
12.
Pull the wing deck outward to separate it from
the center deck section.
13.
Remove the flanged bushings from the upper
pivot points and clean the bore.
Figure 43
3. Cylinder pin
Figure 44
3. Pull outward
4. Left wing deck
1. Upper pivot point
bushing
2. Lower pivot point bolt
g350948
14.
Apply a thin bead of Loctite
circumference of the rear edge of the new
bushings.
15.
Insert and gently tap the new bushings into the
opening and properly seat them into place.
16.
Place a block of wood under the inside edge of
the center deck to make it easier to work on the
lower pivot point bushings.
17.
Remove and retain the lower pivot point bolts
(reference Figure 42 and Figure 45).
18.
Remove and discard the flanged bushing from the
front and rear of the wing deck and clean the bore.
19.
Apply a thin bead of Loctite
circumference of the rear edge of the new
bushings.
20.
Insert and gently tap the new bushings into the
opening and properly seat them into place.
21.
Reinstall the lower deck pin assemblies and bolts
g351309
into the lower deck pivot points and hand-tighten.
22.
To aid in the ease of reinstalling the wing deck
sections, carefully remove the exposed end of the
spring that applies pressure to the rear of the wing
deck cover.
61
Maintenance
Figure 45
3. Deck pin assembly
4. Bushing
®
680 to the entire
®
680 to the entire
g351363

Advertisement

loading

This manual is also suitable for:

Lazer z lzsLazer z lzx411294212