RAB Lighting FALCOR 80W Installation Instructions Manual page 46

Table of Contents

Advertisement

Installing Lightcloud Gateway (Continued)
7
S T E P S E V E N
Turn on the Gateway main
power switch. Replace out-
er cover and use included
screws to secure.
When all devices are
installed and powered,
you're ready to call RAB
to activate and verify your
system, and complete your
site's configuration.
NOTE: Use only RAB-
authorized parts.
16
Installation Lightcloud Gateway
8
S T E P E I G H T
Confirm that the cellular
signal strength LED is
yellow or green. If the
Gateway is powered but
this LED is not lit, relocate
the Gateway to an area
with better reception.
You can use the included power
cable to easily test the signal
strength in a few locations, but
remember that the Gateway
must be hardwired for perma-
nent installation.
9
S T E P N I N E
DEVICE ID
G AT E WAY D E V ICE ID s
1
2
3
Place extra Device ID stickers on your
Lightcloud Device Table (see page 18)
for future reference.
For each device, find the number from the panel
board and write it down on the Device Table.
PANEL/
ZONE NAME
PWR/ENGY
DIM
NOTES
CIRCUIT #

Advertisement

Table of Contents
loading

This manual is also suitable for:

Falcor 160wFalcor 230wFalcor aisle 80wFalcor aisle 160wFalcor aisle 230w

Table of Contents