6) Remember to remove rubber plug. See Fig. 5. 7) Carry out proper vacuum on the purge point connect gas line and R717 side of IPS 8 purger. The R717 side of IPS 8 purger must be pressurized prior to the IPS 8 being put into operation.
User Guide | Intelligent Purging System (IPS 8) Ammonia IPS controller (MCX15B2) After Mechanical / Refrigeration check, the conditions for startup must be checked. setup See Fig. 10 for overview of Electrical Panel and location of Thermal magnetic miniature circuit breakers 13) Switch ON: a.
Page 5
User Guide | Intelligent Purging System (IPS 8) Ammonia Go to Main Screen and watch compressor in operation and pressure/temperature changing. As compressor is in operation, pressure and temperature is changing, after about 15-25 minutes we should observe changes as reflected on below screens.
User Guide | Intelligent Purging System (IPS 8) Ammonia IPS MCX controller – Quick Basically, the IPS with the built-in MCX controller, only need one setting, How many Purge points? start See steps below for how to navigate to the parameter for entering how many Purge points which is connected.
Page 7
User Guide | Intelligent Purging System (IPS 8) Ammonia IPS MCX controller – Quick It can be useful during commissioning to quickly move the next Purge point, in order not to wait to start IPS internal time cycle between purge points.
User Guide | Intelligent Purging System (IPS 8) Ammonia Fig. 1 It is important that the support construction is level to ensure the internal liquid trap is properly filled. Angle to horizontal < 2 degrees Lifting Procedure All 4 lifting eyes must be positioned correctly, to match the actual used lifting gear All 4 lifting eyes must be used Fig.
Page 9
User Guide | Intelligent Purging System (IPS 8) Ammonia Min. 900 mm 1051 mm Min. 500 mm * For easy access to the main switch * For easy access to the main switch and servicing, the Purger unit shall be...
User Guide | Intelligent Purging System (IPS 8) Ammonia Connection points Be aware of liquid traps Where slope is shown above, ensure downward sloping pipe flowing towards purger drop leg. ICF 15-4 NH₃ gas + NC gases Purge Points - up to 8 points...
Page 15
User Guide | Intelligent Purging System (IPS 8) Ammonia XT2 terminal block for field connected solenoids Terminal numbers: 1 and 2: ICFD valve (DO6) 3 and 4: Purge valve no. 1 (DO7) 5 and 6: Purge valve no. 2 (DO8) 7 and 8: Purge valve no.
Page 16
User Guide | Intelligent Purging System (IPS 8) Ammonia XT3 terminal block At different voltage for field connected solenoids coils: Remove connection between terminal: 1 and 3 2 and 4 Install transformer GD2 for supply of field connected solenoids coils.