Prepare the bin.
3.1
Bin top preparation
• Remove protective tape from gaskets
6
3.2
• Apply gaskets
• Install shuttle actuator
dispenser top and secure with locking nut
➌
self-contained
Bin preparation
Bin top preparation
➋
➊
➊
➊
➋
through
BIN • TOP-MOUNT
3
➌