Follett HME1000ABT Installation Instructions Manual page 11

Table of Contents

Advertisement

Water-cooled ice machines – follow steps 7.5 through 7.10.
7.5
Cooling lines
• Install ice machine cooling water lines to
louvered docking assembly
7.7
Potable water and drain lines
• Insert potable water line into valve
• Push drain line over hose barb on back of
evaporator mount
BIN • TOP-MOUNT
Out
In
self-contained
7.6
Ice transport tube
• Slide ice machine into louvered docking
assembly
• Insert ice transport tube into coupling and
tighten nut fi rmly
7.8
Cooling lines and power
• Connect cooling water lines to ice
machine
• Water valve is set at the factory. DO NOT
remove seal or adjust water valve
11

Advertisement

Table of Contents
loading

Table of Contents