Whilst the fire box is still in position, decide which side the gas supply is to enter
the fire from. If concealed pipe work is required plan the pipe run to enter the fire
box through one of the openings in the sides of the fire box below the fuelbed
support panel and connect to the isolating / inlet elbow. The gas connection to the
appliance should be made to the isolating / inlet elbow using 8mm rigid tubing.
There must be no soldered joints within the firebox. See figure 10 & 11 below for
suggested concealed pipe layouts.
Fig. 10
Builders
Opening
Fig. 11
Builders
Opening
Note : Before breaking into the gas supply a tightness test should be carried
out to establish that the existing pipework is sound.
Carefully withdraw the fire box from the opening to enable the gas supply and fire
fixing to be completed.
In line with current GAS SAFE regulations, it is imperative that the gas supply
inlet apertures that are not utilised during the installation are sealed with the
foil tape as supplied. Failure to seal these inlet apertures could lead to flame
reversal, which in turn will damage the burner and control systems of the product.
Approx.
40mm
Gas Supply
Approx.
40mm
15
Gas Supply
Fireplace
Fireplace
Firebox
Firebox

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quasar nrdc sn2 seriesQuasar nrdc rn3 series

Table of Contents