ADS794xEVM-PDK: Software Installation
Step 4. Wait for the driver prompt window to appear. When the plug-in is first loaded, the plug-in
searches for the board. You will see a series of messages in the status area indicating this
action; eventually, the driver prompt window will appear, as
NOTE: If the USBStyx driver was previously installed on the PC, the status area should show the
message Select Device without prompting for the driver. If this message appears, close
ADCpro and proceed to
Step 5. This driver should be present in the PC hard drive with the ADCPro files. Direct the PC to
search the driver and install it by clicking Next --> at every prompt. Be patient; it may take
some time for the PC to find the driver.
NOTE: During the driver installation, a small pop-up window may appear indicating that the firmware
load has timed out. Ignore this pop-up. Continue with the USBStyx driver installation. Once
driver installation has finished, click the Exit button in the small-pop up window.
Step 6. Close ADCPro after the USBStyx driver has been installed.
16
ADS794xEVM and ADS794xEVM-PDK
Figure 11. USBStyx Driver Installation Prompt
Section
7.
Copyright © 2011, Texas Instruments Incorporated
www.ti.com
Figure 11
shows.
SBAU194 – August 2011
Submit Documentation Feedback
Need help?
Do you have a question about the ADS794x EVM Series and is the answer not in the manual?