Ads794Xevm-Pdk Plug-In Installer; Completed Ads794Xevm-Pdk Installer - Texas Instruments ADS794x EVM Series User Manual

Table of Contents

Advertisement

www.ti.com
6.1
Installing the ADCPro Software
Do not connect the ADS794xEVM-PDK to a PC before completing
through
Windows to not recognize the ADS794xEVM-PDK as a connected device.
ADCPro is the primary program used to evaluate ADCs. The latest software version of ADCPro is
available from the TI website at www.ti.com. Refer to the
and using ADCPro.
6.2
Installing ADS794xEVM-PDK Plug-In Software
The ADS794xEVM-PDK plug-in uses ADCPro; you must install ADCPro before uploading the plug-in.
To install the ADS794xEVM-PDK plug-in, run the file: ads794X-adcproplugin-<version #>.exe (<version
#> refers to the installation file version number, and increments with software version releases).
Double-click the file to run it; then follow the instructions as shown. You can also use the ADCPro Update
Check feature to check for newer versions of the ADS794xEVM-PDK plug-in, once you have installed a
version of it.
Figure 4
and
Figure 5
SBAU194 – August 2011
Submit Documentation Feedback
Section
6.4. Failure to observe this caution may cause Microsoft
show the initial and completed installer screenshots, respectively.
Figure 4. ADS794xEVM-PDK Plug-In Installer
Figure 5. Completed ADS794xEVM-PDK Installer
Copyright © 2011, Texas Instruments Incorporated
ADS794xEVM-PDK: Software Installation
CAUTION
ADCPro User Guide
ADS794xEVM and ADS794xEVM-PDK
Section 6.2
for instructions on installing
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS794x EVM Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ads794 evm-pdk series

Table of Contents