Figure 29. Installing the storage interposer module
Next steps
1.
Install the M.2 direct riser module
Cooling fans
Removing a cooling fan on 2U sled
Prerequisites
1. Follow the safety guidelines listed in
2. Follow the procedure listed in
3.
Remove the air shroud
NOTE:
Observe the fan cable routing or make a note of the fan cable routing.
Steps
1. Route the fan cables properly through the fan guard and disconnect the cable from the connector on the power distribution
board (PDB) of the 2U sled.
NOTE:
Fan 5, 6, 7 and 8 are connected to the 2U PDB.
64
Installing and removing system components
Safety
Instructions.
Before working inside your
system.