Cable Routing - Dell PowerEdge XR8620t Installation And Service Manual

Table of Contents

Advertisement

Figure 52. Installing the 1U power distribution board
Next steps
1. Connect the cables connected from cooling fans and system board to the 1U power distribution board (PDB).
2.
Install the Riser 2
3.
Install the 2u floor on the 1u node

Cable routing

Figure 53. Configuration 1
Installing and removing system components
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

E08b

Table of Contents