System Setup - Keysight Technologies N52 Series User's And Service Manual

Millimeter head controller
Table of Contents

Advertisement

Installation & System Operation

System Setup

It is recommended that you connect the cables to the rear panel of the test set
before mounting the analyzer on top of the test set. When the analyzer is
mounted on the test set, the back of the analyzer extends over the rear panel
of the test set and may interfere with access to the rear panel connectors. The
cables can then be connected to the analyzer after it is mounted on the test
set.
diagrams to use for your configuration.
The network analyzer is heavy. It is recommended that two individuals,
or a mechanical lift be used to lift or transport the instrument.
Mounting a Network Analyzer on the Test Set
Refer to the following kits for your specific analyzer. In this procedure a
N5242A/B 4-Port PNA-X is used with a N5262A. There are other kits available
via the U3021M model. Refer to
Assistance" on page 92
— Locking Kit (U3021-60002) for the test set. Includes the Locking kit
— Locking Kit (U3021-60003) for the test set. Includes the Locking kit
1. Remove the feet from the bottom of the analyzer.
2. Remove the two lower standoffs from the rear panel on the analyzer.
24
Table 1-4 on page 13
or
for ordering information.
(5023-0132) and screws (0515-2317) to connect the test set to the
N5222A/B PNA or N5242A/B PNA-X. The N5242-20138 is the right foot
and N5242-20139 is the left.
(5023-0132) and screws (0515-2317) to connect the test set to the
N5224/25/27A/B PNA or N5244/45/47A/B PNA-X. The N5242-20130 is
the right foot and N5242-20131 is the left foot.
Table 1-5 on page 14
indicates which connection
"Keysight Support, Services, and
Keysight N5261/62A User's & Service Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

N5261aN5262aN5261/62a

Table of Contents