Safety Instruction
· Please read this manual carefully, also with related manual for the machinery before use the controller.
· For installing and operating the controller properly and safely, qualified engineers are required.
· Please stay away from arc welding equipment, in order to avoid electromagnetic interference and malfunction of the
controller.
· Keep room temperature bellow 45°c and above 0°c
· Do not use in humidity below 30% or above 95% or dew and mist places.
· Please turn off the power and unplug the power cord, before install the control box and other components,
· To prevent interference or electric leakage accidents, please make the ground work; the power cord ground wire must
be securely connected to earth by an effective way.
· All parts for the repair provided by the Company or approved before use.
· Please turn off the power and unplug the power cord before any maintenance action. There is dangerous high voltage
control box, you must turn the power off after one minute before opening the control box.
· The symbol
in this manual means Safety Precautions, please pay attention to it and strictly follow it, to avoid any
unnecessary damage.
1 Installation Instructions
1.1 Product specifications
Product Type
Power frequency
1.2 Port diagram
Plug each connection plug of the machine head into the corresponding socket behind the controller as Figure 1-2-1.18P functional port as
Figure 1-2-2.Well connected, please check whether the plug is firmly inserted.
1.2.1 Name of each port
18P function port corresponding
1.2.2 18P function port corresponding table
1
2
Thickness
Thickness
Detection
Detection
Signal
GND
10
11
/
/
A7 Operation Manual
A7
Supply Voltage
50Hz/60Hz
Maximum output power
The pedals mouth
3
4
/
Thickness
Detection
Power supply +5V
12
13
/
/
AC 220 ±20%V
550W
18P
function
port
corresponding
5
6
/
/
Low Oil level
detection GND
14
15
16
/
Low Oil
Switchgroup-
Detection
Fill half a needle
signal
第 1页共 10 页
Exhaust
Stepper
encoder port
encoder
port
7
8
Switchgroup
GND
17
Switchgroup-
backstitch
Stepper
power
port
9
Switchgroup
Power supply
+5V
18
Switchgroup-
Fill the
needle
Need help?
Do you have a question about the A7 and is the answer not in the manual?
Questions and answers